RACK BUILD TOOL / AI INFRASTRUCTURE

Plan the rack.
Build the system.

Turn a workload into a complete infrastructure plan. Compute, networks, storage, power and cooling — connected in one engineering workspace.

Explore in your browser. Sign in to save shared organization projects.

SERVER PLATFORMSAMDNVIDIAIntelCerebras
THE COMPLETE BUILDCONCEPT → HANDOFF
RACK 01RACK 02RACK 03NETWORKPOWER + WATERPLAN EVERY CONNECTION.EXPLAIN EVERY REQUIREMENT.
Compute & fabric Power & coolingIllustrative layout
01 Define the workload02 Engineer the system03 Prepare the build
NVIDIA SERVER & RACK SYSTEMS

GB300 NVL72 · 155 kW peak per rack.

Configure Blackwell Ultra B300 / GB300, Blackwell B200 / GB200, and Hopper H200 / H100 servers. Compare included components, RDMA fabrics and OEM cooling requirements.

Configure GB300 NVL72 →
FROM REQUIREMENTS TO RACKS

Every connection considered.

Greenfield or brownfield. Inference, training, fine tuning or lab. Make the assumptions visible before equipment arrives.

01 / SIZE

Compute with a reason.

Compare server platforms, model memory and parallelism. Keep measured performance separate from engineering estimates.

Configure a system →
02 / CONNECT

The facility is part of the build.

Plan RDMA and customer networks, management, storage, power distribution, liquid loops and CDU capacity together.

Explore infrastructure →
03 / DELIVER

A layout your team can follow.

Visualize the floor, rack elevations, network paths, power and water. Export equipment placement and installation hold points.

Open technician layouts →
ONE PROJECT. A SHARED PLAN.

Bring the team into the build.

Organization projects, scoped roles, versioned calculations and controlled access to commercial information.

Create your account ↗